Excavations

This project involved our team digging down to a depth of three meters to expose the old clay pipework on a property, and then carefully fitting an anti-flood valve in-situ.

Once the anti-flood valve was securely in place our engineers then installed a concrete chamber to give access to the valve should the need arise in the future.

Find out more about our Excavations here.

  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide
  • slide